CDR has contracted with the Pima County Department of Transportation to develop a design concept and arrange for fabrication of the approved aesthetic treatments for art included in the the new bridge over the Canyon Del Oro Wash. The new bridge is an entryway to the Canyon Del Oro Linear Park. The design project includes sound barrier walls and retaining walls for La Cholla Boulevard, Magee Road to Lambert Lane. ARTWORK will be used to help integrate the Project site with the surrounding architecture and landscape and to celebrate the special characteristics and values of the surrounding communities.