The City of Tucson and the Tucson Public Art Program have contracted with CDR to design and write the fabrication specs for aesthetics on sound barriers and also for the bridge deck, parapet and parapet railings along the Sabino Canyon Rd. connection to Kolb Rd.  CDR has finished the Final Design Phase of the Project and construction of the bridge began in summer 2013.